7.4 kW• Semi-fast24/7Active in MITECO registry

E-M-SanSebastianDeLosReyes-008

Teide,4, San Sebastián de los Reyes (28703), Madrid, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates40.55503, -3.61931
Official IDZ4PPYNPDZWXQ8CZOAGND
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Sebastián de los Reyes, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
4.6 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
4.6 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
4.6 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeZ4PPYNPDZWXQ8CZOAGND
Post / EVSE Identifier #1W4UY8RTPQZOXP3U3URGORK5YGCD
Post / EVSE Identifier #2ES*IBD*E409037
Post / EVSE Identifier #3322724
Post / EVSE Identifier #48HLDB6BUZJ5QRUDAJ6RKRUB4YCY
Post / EVSE Identifier #5ES*IBD*E409035
Post / EVSE Identifier #6322722
Post / EVSE Identifier #7US1UYVHPARJFMJP2UIPK7L1WM9K
Post / EVSE Identifier #8ES*IBD*E409036
Post / EVSE Identifier #9322723
Post / EVSE Identifier #10XAIXRYQ3UKM1Q7GOBZXVDRG7B8X
Post / EVSE Identifier #11ES*IBD*E409129
Post / EVSE Identifier #12322807

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.555035 | Lon: -3.6193073View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
4.2 km away

M-ALCOBENDAS-008

Marquesa Viuda Aldama,50
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.