22 kW• Semi-fastHorario habitualActive in MITECO registry

E-M-Madrid-097

Julián Camarillo,13, Madrid (28037), Madrid, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates40.43470, -3.63160
Official ID2024002382
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024002382
Post / EVSE Identifier #1COD20240000026476PR00006127
Post / EVSE Identifier #2ES*IBD*E215399
Post / EVSE Identifier #3227219
Post / EVSE Identifier #4COD20240000026477PR00006128
Post / EVSE Identifier #5ES*IBD*E215400
Post / EVSE Identifier #6227220
Post / EVSE Identifier #7COD20240000026478PR00006129
Post / EVSE Identifier #8ES*IBD*E215403
Post / EVSE Identifier #9227223
Post / EVSE Identifier #10COD20240000026479PR00006130
Post / EVSE Identifier #11ES*IBD*E215404
Post / EVSE Identifier #12227224

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Lunes (09:00 - 21:30) Miercoles (09:00 - 21:30) Jueves (09:00 - 21:30) Martes (09:00 - 21:30) Viernes (09:00 - 21:30)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.4347 | Lon: -3.631598View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
8.1 km away

M-ALCOBENDAS-009

Encinar De Los Reyes,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.