7.4 kW• Semi-fast24/7Active in MITECO registry

E-IB-Alaior-001

Son Bou,1, Alaior (07730), Balears, Illes, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (4 plugs)
GPS Coordinates39.89883, 4.07833
Official ID2024002140
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alaior, belonging to the province of Balears, Illes (Balears, Illes, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Schuko (Enchufe doméstico)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
2 connectors available
Schuko (Enchufe doméstico)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
7.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024002140
Post / EVSE Identifier #1COD20240000025754PR00005405
Post / EVSE Identifier #2ES*IBD*E4423
Post / EVSE Identifier #34583
Post / EVSE Identifier #44584
Post / EVSE Identifier #5COD20240000025755PR00005406
Post / EVSE Identifier #6ES*IBD*E4424
Post / EVSE Identifier #74586
Post / EVSE Identifier #84585

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.898831 | Lon: 4.078328View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
7.2 km away

PARCBIT

LAURA BASSI SN
Operator:FUNDACIO BALEAR D'INNOVACIÓ I TECNOLOGIA
Tipo 2 (Mennekes)
1 point • 1 plug
Details
7.4 kW(Semi-fast)
14.6 km away

Sa Granja

Sa Granja, carretera Maó-Es Grao km 0,5
Operator:Consell Insular de Menorca
Tipo 1 (Yazaki)Schuko (Enchufe doméstico)
1 point • 2 plugs
Details
7.4 kW(Semi-fast)
16.0 km away

AJUNTAMENT DE SANT LLUIS

Passeig Marítim de Binibèquer s/n (Binibeca Vell)
Operator:AJUNTAMENT DE SANT LLUIS
Tipo 1 (Yazaki)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.