22 kW• Semi-fastHorario habitualActive in MITECO registry

E-CR-CiudadReal-004

Santa Cruz De Mudela,4, Ciudad Real (13005), Ciudad Real, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates38.96950, -3.92833
Official ID2025000036
Official Registry DateDec 27, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ciudad Real, belonging to the province of Ciudad Real (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000036
Post / EVSE Identifier #1COD20250000047833PR00000157
Post / EVSE Identifier #2ES*IBD*E227692
Post / EVSE Identifier #3239612
Post / EVSE Identifier #4COD20250000047834PR00000158
Post / EVSE Identifier #5ES*IBD*E227693
Post / EVSE Identifier #6239613
Post / EVSE Identifier #7COD20250000047835PR00000159
Post / EVSE Identifier #8ES*IBD*E227694
Post / EVSE Identifier #9239614
Post / EVSE Identifier #10COD20250000047836PR00000160
Post / EVSE Identifier #11ES*IBD*E227695
Post / EVSE Identifier #12239615
Post / EVSE Identifier #13COD20250000047837PR00000161
Post / EVSE Identifier #14ES*IBD*E227696
Post / EVSE Identifier #15239616
Post / EVSE Identifier #16COD20250000047838PR00000162
Post / EVSE Identifier #17ES*IBD*E227697
Post / EVSE Identifier #18239617

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (09:00 - 21:30) Martes (09:00 - 21:30) Jueves (09:00 - 21:30) Domingo (00:00 - 00:00) Sabado (00:00 - 00:00) Viernes (09:00 - 21:30) Lunes (09:00 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.969499 | Lon: -3.928334View on OpenStreetMap →

Other Nearby Charging Stations

120 kW(Fast)
400 m away

Popeyes - Ciudad Real

De Los Reyes Católicos,1
Operator:CHARGING TOGETHER SL
CCS Combo 2CHAdeMO
3 points • 4 plugs
Details
50 kW(Fast)
620 m away

CR-CiudadReal-004

Villarrubia De Los Ojos,18
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
2 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.