22 kW• Semi-fast24/7Active in MITECO registry

E-BI-Durango-003

San Roke Auzoa,22, Durango (48200), Bizkaia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates43.16793, -2.64313
Official ID2024000151
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Durango, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000151
Post / EVSE Identifier #1COD20240000017718PR00000433
Post / EVSE Identifier #2ES*IBD*E156588
Post / EVSE Identifier #3166058
Post / EVSE Identifier #4COD20240000017719PR00000434
Post / EVSE Identifier #5ES*IBD*E156589
Post / EVSE Identifier #6166059

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📅Advance slot reservation supported
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.16793 | Lon: -2.643134View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)🏨Hotel / Alojamiento
2.8 km away

Hotel San Blas

Laubideta, 7
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
50 kW(Fast)
3.6 km away

Barrio BERNA

Berna,4
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
1 point • 2 plugs
Details
7.3 kW(Standard)
3.9 km away

BI-Garai-002

San Migel,20
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.