22 kW• Semi-fastHorario habitualActive in MITECO registry

E-AL-Nijar-002

Iryda,8, Níjar (04113), Almería, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates36.92396, -2.14951
Official ID2025000403
Official Registry DateMar 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Níjar, belonging to the province of Almería (Andalucía, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000403
Post / EVSE Identifier #1COD20250000049965PR00001580
Post / EVSE Identifier #2ES*IBD*E222586
Post / EVSE Identifier #3234593
Post / EVSE Identifier #4COD20250000049966PR00001581
Post / EVSE Identifier #5ES*IBD*E222587
Post / EVSE Identifier #6234594
Post / EVSE Identifier #7COD20250000049967PR00001582
Post / EVSE Identifier #8ES*IBD*E222570
Post / EVSE Identifier #9234577
Post / EVSE Identifier #10COD20250000049968PR00001583
Post / EVSE Identifier #11ES*IBD*E222571
Post / EVSE Identifier #12234578
Post / EVSE Identifier #13COD20250000049969PR00001584
Post / EVSE Identifier #14ES*IBD*E222572
Post / EVSE Identifier #15234579
Post / EVSE Identifier #16COD20250000049970PR00001585
Post / EVSE Identifier #17ES*IBD*E222573
Post / EVSE Identifier #18234580

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (09:00 - 21:30) Martes (09:00 - 21:30) Lunes (09:00 - 21:30) Viernes (09:00 - 21:30) Jueves (09:00 - 21:30)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 36.923956 | Lon: -2.149513View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)⛽Estación BP
2.1 km away

BP Campohermoso

Av. Príncipe de Asturias 4117
Operator:Atlante Iberia SL
CCS Combo 2
1 point • 2 plugs
Details
120 kW(Fast)🛒Supermercado Consum
2.2 km away

Supermercado Consum Nijar

C. Málaga, Campohermoso, Níjar, Almería
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.