22 kW• Semi-fastHorario habitualActive in MITECO registry

E-A-Denia-015

Saladar,12, Dénia (03700), Alicante/Alacant, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity10 bays (10 plugs)
GPS Coordinates38.83546, 0.10426
Official ID2024003470
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Dénia, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
9Charging Bay #9
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003470
Post / EVSE Identifier #1COD20240000030544PR00008467
Post / EVSE Identifier #2ES*IBD*E232282
Post / EVSE Identifier #3244483
Post / EVSE Identifier #4COD20240000030545PR00008468
Post / EVSE Identifier #5ES*IBD*E232283
Post / EVSE Identifier #6244484
Post / EVSE Identifier #7COD20240000030546PR00008469
Post / EVSE Identifier #8ES*IBD*E232284
Post / EVSE Identifier #9244485
Post / EVSE Identifier #10COD20240000030547PR00008470
Post / EVSE Identifier #11ES*IBD*E232285
Post / EVSE Identifier #12244486
Post / EVSE Identifier #13COD20240000030548PR00008471
Post / EVSE Identifier #14ES*IBD*E232286
Post / EVSE Identifier #15244487
Post / EVSE Identifier #16COD20240000030549PR00008472
Post / EVSE Identifier #17ES*IBD*E232287
Post / EVSE Identifier #18244488
Post / EVSE Identifier #19COD20240000030550PR00008473
Post / EVSE Identifier #20ES*IBD*E232288
Post / EVSE Identifier #21244489
Post / EVSE Identifier #22COD20240000030551PR00008474
Post / EVSE Identifier #23ES*IBD*E232289
Post / EVSE Identifier #24244490
Post / EVSE Identifier #25COD20240000030552PR00008475
Post / EVSE Identifier #26ES*IBD*E232290
Post / EVSE Identifier #27244491
Post / EVSE Identifier #28COD20240000030553PR00008476
Post / EVSE Identifier #29ES*IBD*E232291
Post / EVSE Identifier #30244492

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (09:00 - 21:30) Martes (09:00 - 21:30) Lunes (09:00 - 21:30) Viernes (09:00 - 21:30) Jueves (09:00 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.835459 | Lon: 0.104259View on OpenStreetMap →

Other Nearby Charging Stations

30 kW(Semi-fast)
1.5 km away

Marina de Denia

Puerto Deportivo
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
3 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.