22 kW• Semi-fastHorario habitualActive in MITECO registry

E-A-Castalla-005

De Alicante,S/N, Castalla (03420), Alicante/Alacant, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates38.59221, -0.66585
Official ID2024004852
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Castalla, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
⚡ 800V22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:800 V (Alta Tensión)
Amperage:40 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
⚡ 800V22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:800 V (Alta Tensión)
Amperage:40 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
⚡ 800V22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:800 V (Alta Tensión)
Amperage:40 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
⚡ 800V22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:800 V (Alta Tensión)
Amperage:40 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004852
Post / EVSE Identifier #1COD20240000039457PR00012600
Post / EVSE Identifier #2ES*IBD*E236298
Post / EVSE Identifier #3248509
Post / EVSE Identifier #4COD20240000039458PR00012601
Post / EVSE Identifier #5ES*IBD*E236299
Post / EVSE Identifier #6248510
Post / EVSE Identifier #7COD20240000039459PR00012602
Post / EVSE Identifier #8ES*IBD*E236314
Post / EVSE Identifier #9248468
Post / EVSE Identifier #10COD20240000039460PR00012603
Post / EVSE Identifier #11ES*IBD*E236315
Post / EVSE Identifier #12248469

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Viernes (09:00 - 21:30) Miercoles (09:00 - 21:30) Martes (09:00 - 21:30) Lunes (09:00 - 21:30) Jueves (09:00 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.592208 | Lon: -0.665853View on OpenStreetMap →

Other Nearby Charging Stations

120 kW(Fast)🛒Supermercado Consum
430 m away

SM Consum 494 - Castalla

Av. De Onil, 58, 03420 Castalla, Alicante
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
150 kW(Ultra-fast)
6.5 km away

Burger King Ibi

Leon,4
Operator:CHARGING TOGETHER SL
CCS Combo 2
4 points • 4 plugs
Details
50 kW(Fast)
8.1 km away

62104044710001

Energia Y Carburantes - Calle Carmen Martin
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.