50 kW• Fast🏬Centro ComercialHorario habitualActive in MITECO registry

CS-Castellondelaplana-006

Parque Comercial Estepark,1, Castelló de la Plana/Castellón de la Plana (12006), Castellón/Castelló, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (6 plugs)
GPS Coordinates39.97498, -0.06269
Official ID2024001043
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Castelló de la Plana/Castellón de la Plana, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A
3Charging Bay #3
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001043
Post / EVSE Identifier #1COD20240000023152PR00003095
Post / EVSE Identifier #2ES*IBD*E9332
Post / EVSE Identifier #39933
Post / EVSE Identifier #49932
Post / EVSE Identifier #5COD20240000023153PR00003096
Post / EVSE Identifier #6ES*IBD*E9333
Post / EVSE Identifier #79934
Post / EVSE Identifier #8COD20240000023154PR00003097
Post / EVSE Identifier #9ES*IBD*E9352
Post / EVSE Identifier #109953
Post / EVSE Identifier #119952
Post / EVSE Identifier #12COD20240000023155PR00003098
Post / EVSE Identifier #13ES*IBD*E9353
Post / EVSE Identifier #149954

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Jueves (07:00 - 23:59) Martes (07:00 - 23:59) Lunes (07:00 - 23:59) Miercoles (07:00 - 23:59) Viernes (07:00 - 23:59) Sabado (07:00 - 23:59) Domingo (10:00 - 23:59)

Supported Payment Methods

✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
📅Advance slot reservation supported
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.97498 | Lon: -0.06269View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
830 m away

CS-Castellondelaplana-013

Europa (Ciudad Del Transporte),1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.