150 kW• Ultra-fast🏬Centro Comercial24/7Active in MITECO registry

Centro Comercial Ruta de la Plata - Cáceres

C. Londres, 35, Oeste, 10005 Cáceres, Spain, Cáceres (10005), Cáceres, Spain
Network OperatorPunto Recargas SL
Total Capacity18 bays (18 plugs)
GPS Coordinates39.46892, -6.39087
Official IDNHXXQFIZHBNSCEFXMUQA
Official Registry DateMar 02, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cáceres, belonging to the province of Cáceres (Extremadura, Spain). The charging equipment and commercial operation belong to the Punto Recargas SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:188 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:188 A
3Charging Bay #3
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:188 A
4Charging Bay #4
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:188 A
5Charging Bay #5
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
6Charging Bay #6
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:188 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
9Charging Bay #9
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
11Charging Bay #11
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
12Charging Bay #12
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
13Charging Bay #13
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
14Charging Bay #14
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
15Charging Bay #15
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
16Charging Bay #16
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
17Charging Bay #17
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
18Charging Bay #18
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeNHXXQFIZHBNSCEFXMUQA
Post / EVSE Identifier #1UL57LOAZSR6QAL3CSXPA6TGBBQQ
Post / EVSE Identifier #2ES*PWH*ERUTCACKEM00561
Post / EVSE Identifier #31
Post / EVSE Identifier #4OT6H4NKIG55IFJ9RAOHU0FFBG7S
Post / EVSE Identifier #5ES*PWH*ERUTCACKEM00562
Post / EVSE Identifier #62
Post / EVSE Identifier #72Q9VSFRD2RWE8DX5MUEQASLLHK3
Post / EVSE Identifier #8ES*PWH*ERUTCACKEM00563
Post / EVSE Identifier #93
Post / EVSE Identifier #10O4VL8PF3FRNCCFRDFL1WLE2ZQ1M
Post / EVSE Identifier #11ES*PWH*ERUTCACKEM00564
Post / EVSE Identifier #124
Post / EVSE Identifier #13OEVVMQ13NUEWSFAN80ZHMYIDE7P
Post / EVSE Identifier #14ES*PWH*ERUTCACKEM00565
Post / EVSE Identifier #155
Post / EVSE Identifier #16OHTDGOM7BVRAY4ZUK2BYWTKUS12
Post / EVSE Identifier #17ES*PWH*ERUTCACKEM00566
Post / EVSE Identifier #186
Post / EVSE Identifier #19ZSAFBEO4BPINXKTFCM379HNMFPK
Post / EVSE Identifier #20ES*PWH*ERUTCACALF02261
Post / EVSE Identifier #21S6NV6UPKXCTJY8XT8HVLTA2WLJJ
Post / EVSE Identifier #22ES*PWH*ERUTCACALF02271
Post / EVSE Identifier #23ZC3V52GNWZFGDWVMB4PNYQ4QCWS
Post / EVSE Identifier #24ES*PWH*ERUTCACALF02281
Post / EVSE Identifier #25JAPZT2ZPZNKICZWNJX2HOC88GF1
Post / EVSE Identifier #26ES*PWH*ERUTCACALF02291
Post / EVSE Identifier #27JMZVFXPWZEMFSE736RCQ05SNAFZ
Post / EVSE Identifier #28ES*PWH*ERUTCACALF02301
Post / EVSE Identifier #29PM8MQJQVKVO0QMVH0PD43VHJ1GB
Post / EVSE Identifier #30ES*PWH*ERUTCACALF02311
Post / EVSE Identifier #315EEH27SLJXJNGKIL19OB3ZFJDOB
Post / EVSE Identifier #32ES*PWH*ERUTCACALF02321
Post / EVSE Identifier #33XUPWAUN9L78ASUVEASECSRPZMSE
Post / EVSE Identifier #34ES*PWH*ERUTCACALF02331
Post / EVSE Identifier #35H85JPO1DEJPLDJNWLRSNBOTZRVT
Post / EVSE Identifier #36ES*PWH*ERUTCACALF02341
Post / EVSE Identifier #370EBB1HZGVCWL0LK1QZR1H6U7NWA
Post / EVSE Identifier #38ES*PWH*ERUTCACALF02351
Post / EVSE Identifier #39YUKOCWMJYUCJLSZJUVKXUGFP10Q
Post / EVSE Identifier #40ES*PWH*ERUTCACALF02361
Post / EVSE Identifier #41CVFTAX8ZET9NWT9OVXUZQPFTXPA
Post / EVSE Identifier #42ES*PWH*ERUTCACALF02371

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

24/7

Supported Payment Methods

🔓Remote plug unlock supported
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.468915 | Lon: -6.390872View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
110 m away

62009007340011

Cc Ruta De La Plata - C. Londres, 1, 10005
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
110 m away

62009007340001

Cc Ruta De La Plata - C. Londres, 1, 10005
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)🏬Centro Comercial
520 m away

21XP22T3KKJAK00609

Centro Comercial El Farallón, Av. Ruta De La
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.