80 kW• Fast🏬Centro ComercialHorario habitualActive in MITECO registry

Centro Comercial Parque Santiago 6

Parque Santiago 6 Locales 25 Y 26, 38650 Play, Arona (38650), Santa Cruz de Tenerife, Spain
Network OperatorPunto Recargas SL
Total Capacity8 bays (8 plugs)
GPS Coordinates28.05843, -16.72073
Official IDMWUI3GTEAP24YQF1SMPZ
Official Registry DateSep 03, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Arona, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the Punto Recargas SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:160 A
2Charging Bay #2
1 connector available
CCS Combo 2
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:160 A
3Charging Bay #3
1 connector available
CCS Combo 2
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:160 A
4Charging Bay #4
1 connector available
CCS Combo 2
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:160 A
5Charging Bay #5
1 connector available
CCS Combo 2
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:160 A
6Charging Bay #6
1 connector available
CCS Combo 2
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:160 A
7Charging Bay #7
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
8Charging Bay #8
1 connector available
CCS Combo 2
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:160 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeMWUI3GTEAP24YQF1SMPZ
Post / EVSE Identifier #1KZPBABPG261WEZAAHYFLG5TA55B
Post / EVSE Identifier #2ES*PWH*ESANTENKEM00861
Post / EVSE Identifier #31
Post / EVSE Identifier #4DISLFNBGU6COMOMNI0IJCC3XJVW
Post / EVSE Identifier #5ES*PWH*ESANTENKEM00862
Post / EVSE Identifier #62
Post / EVSE Identifier #7Q4RE7MMMWAABS4J7ML8MFMJ3DLK
Post / EVSE Identifier #8ES*PWH*ESANTENKEM00863
Post / EVSE Identifier #93
Post / EVSE Identifier #10UIPZSYETDQIBCFRSDZQQXLCHDDL
Post / EVSE Identifier #11ES*PWH*ESANTENKEM00864
Post / EVSE Identifier #124
Post / EVSE Identifier #13UIPCPUS3NTON2TOOY6FFGJJBHC9
Post / EVSE Identifier #14ES*PWH*ESANTENKEM00865
Post / EVSE Identifier #155
Post / EVSE Identifier #16NIRX10PQO08FQZE0HVD9ANSVIEA
Post / EVSE Identifier #17ES*PWH*ESANTENKEM00866
Post / EVSE Identifier #186
Post / EVSE Identifier #19PTNQMOTYR0DBETBX07BFLYTTQPI
Post / EVSE Identifier #20ES*PWH*ESANTENKEM00867
Post / EVSE Identifier #217
Post / EVSE Identifier #22OAJ0MSKWCHTNWWESP4LZOGPVV7H
Post / EVSE Identifier #23ES*PWH*ESANTENKEM00868
Post / EVSE Identifier #248

Theoretical Charging Times at Maximum Power (80 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~15 min(~0.3 hours)
40 kWh Battery~30 min(~0.5 hours)
60 kWh Battery~45 min(~0.8 hours)
80 kWh Battery~1 h(~1 hours)

Opening Hours

Lunes (10:00 - 22:00) Martes (10:00 - 22:00) Domingo (10:00 - 22:00) Miercoles (10:00 - 22:00) Jueves (10:00 - 22:00) Viernes (10:00 - 22:00) Sabado (10:00 - 22:00)

Supported Payment Methods

🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.058432 | Lon: -16.720729View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
550 m away

Gara Suites Golf & Spa

Calle Landa Golf, 2
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
22 kW(Semi-fast)
810 m away

DISA CRISTIANOS IV

Av. Los Playeros, S/N
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
810 m away

DISA CRISTIANOS II

Av. Los Playeros,S/N
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.