50 kW• Fast🏬Centro Comercial24/7Active in MITECO registry

Centro Comercial La Villa 2

Autopista Del Nte. 36, Orotava, La (38312), Santa Cruz de Tenerife, Spain
Network OperatorPunto Recargas SL
Total Capacity3 bays (3 plugs)
GPS Coordinates28.39624, -16.54831
Official IDMSL8EH2G131XJOBN90C7
Official Registry DateJul 28, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Orotava, La, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the Punto Recargas SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:63 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:63 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeMSL8EH2G131XJOBN90C7
Post / EVSE Identifier #1NK5N6R6HQEJK6YGVYSFJRBBAPCG
Post / EVSE Identifier #2ES*PWH*EVILTENDEL00011
Post / EVSE Identifier #31
Post / EVSE Identifier #4FPV4OGJHLLYEO9OMYIPO5WGGG9Q
Post / EVSE Identifier #5ES*PWH*EVILTENDEL00012
Post / EVSE Identifier #62
Post / EVSE Identifier #7RC52DXRRBDHT1UE8CL44KRQ6FVB
Post / EVSE Identifier #8ES*PWH*EVILTENDEL00013
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.39624 | Lon: -16.548312View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
710 m away

US_296_La_Orotava

C/ Albañilería
Operator:PLENOIL CANARIAS, S.L.U.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
7.4 kW(Semi-fast)
2.3 km away

61918020810010

Av. Loro Parque, 38400 Puerto De La Cruz,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.