50 kW• Fast🏬Centro ComercialHorario habitualActive in MITECO registry

Centro Comercial Galeon Outlet

Oulet, Adeje (38670), Santa Cruz de Tenerife, Spain
Network OperatorPunto Recargas SL
Total Capacity12 bays (12 plugs)
GPS Coordinates28.11676, -16.73059
Official IDOR41GEJ2B28OI3PGJZSN
Official Registry DateJun 02, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Adeje, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the Punto Recargas SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
7Charging Bay #7
1 connector available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:63 A
8Charging Bay #8
1 connector available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:63 A
9Charging Bay #9
1 connector available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:63 A
10Charging Bay #10
1 connector available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:63 A
11Charging Bay #11
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
12Charging Bay #12
1 connector available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:63 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeOR41GEJ2B28OI3PGJZSN
Post / EVSE Identifier #1PMG69Y25Z5DAHGQBE1JVUVZSCBT
Post / EVSE Identifier #2ES*PWH*EARCTENALF00661
Post / EVSE Identifier #31
Post / EVSE Identifier #4JJAX6W55KRRGXR0JZY63DEPK91I
Post / EVSE Identifier #5ES*PWH*EARCTENALF00662
Post / EVSE Identifier #62
Post / EVSE Identifier #7RWKRW6VJ6AH6VXEWWVDLNODG8NA
Post / EVSE Identifier #8ES*PWH*EARCTENALF00671
Post / EVSE Identifier #92TIIDLVFEQYBQR5AQQSB3QF5RPQ
Post / EVSE Identifier #10ES*PWH*EARCTENALF00672
Post / EVSE Identifier #11UPZYAET0N8Y7RLYJUGFPWQUU94G
Post / EVSE Identifier #12ES*PWH*EARCTENALF00681
Post / EVSE Identifier #13ERXOXK4K5FKKNT0I7AMN0SPTGW7
Post / EVSE Identifier #14ES*PWH*EARCTENALF00682
Post / EVSE Identifier #15TVJ4RIQ5MRJEHYG4OVDN7LYSJC3
Post / EVSE Identifier #16ES*PWH*EARCTENKEM00341
Post / EVSE Identifier #17O0IDP64NKCYHW0R0ZR64OUJQ6KR
Post / EVSE Identifier #18ES*PWH*EARCTENKEM00342
Post / EVSE Identifier #195VPHWHSEHWG10EUJRS6IJZQT5OC
Post / EVSE Identifier #20ES*PWH*EARCTENKEM00343
Post / EVSE Identifier #213
Post / EVSE Identifier #22CKOLU36OQQQBV2A5QXYVTD7XNH3
Post / EVSE Identifier #23ES*PWH*EARCTENKEM00344
Post / EVSE Identifier #244
Post / EVSE Identifier #25ZC3GDNSS2J8FYKFKSXCFHJ5CI7U
Post / EVSE Identifier #26ES*PWH*EARCTENKEM00345
Post / EVSE Identifier #275
Post / EVSE Identifier #28LPY4IAQHRSBCXCZEPKBOGC7CIDK
Post / EVSE Identifier #29ES*PWH*EARCTENKEM00346
Post / EVSE Identifier #306

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Martes (07:00 - 23:59) Miercoles (07:00 - 23:59) Domingo (07:00 - 23:59) Lunes (07:00 - 23:59) Viernes (07:00 - 23:59) Sabado (07:00 - 23:59) Jueves (07:00 - 23:59)

Supported Payment Methods

🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.116757 | Lon: -16.730587View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
1.3 km away

US_330CA_Adeje

Avenida De Ayyo
Operator:PLENOIL CANARIAS, S.L.U.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
2.7 km away

62020013930041

C. Roque Nublo, 1, 38670 Costa Adeje, Santa
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)🏨Hotel / Alojamiento
2.8 km away

Hotel Tivoli La Caleta

C. La Enramada, 9
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)
7 points • 7 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.