0.06 kW• Standard24/7Active in MITECO registry

Cellnex Lleida.

Avinguda d'Alpicat ur Buenos Aires, 2, Alpicat (25110), Lleida, Spain
Network OperatorAtlante Iberia SL
Total Capacity2 bays (4 plugs)
GPS Coordinates41.66552, 0.52583
Official ID2023002107
Official Registry DateAug 09, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alpicat, belonging to the province of Lleida (Cataluña, Spain). The charging equipment and commercial operation belong to the Atlante Iberia SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
0.06 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
0.06 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
2 connectors available
CCS Combo 2
0.06 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
0.06 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002107
Post / EVSE Identifier #1COD20230000010531PR00000288
Post / EVSE Identifier #2ES*ATE*E11A402BF
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #5COD20230000010532PR00000289
Post / EVSE Identifier #6ES*ATE*E11A302BE

Theoretical Charging Times at Maximum Power (0.06 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~333 h 20 min(~333.3 hours)
40 kWh Battery~666 h 40 min(~666.7 hours)
60 kWh Battery~1000 h(~1000 hours)
80 kWh Battery~1333 h 20 min(~1333.3 hours)

Opening Hours

24/7

Supported Payment Methods

✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.66552 | Lon: 0.525833View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
2.1 km away

Alpicat

Passeig del Parc S/n (Pavello municipal)
Operator:AYUNTAMIENTO DE ALPICAT
Tipo 2 (Mennekes)
1 point • 1 plug
Details
350 kW(Ultra-fast)
3.6 km away

Lleida

Camí Vell
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.