22 kW• Semi-fast24/7Active in MITECO registry

Campo de Fútbol del Barrial

C. Primero De Mayo, Campo De Futbol Barrial, Gáldar (35469), Palmas, Las, Spain
Network OperatorConsejo Insular de la Energía de Gran Canaria
Total Capacity2 bays (2 plugs)
GPS Coordinates28.14123, -15.66416
Official IDC2KHXR24EXLTAB6HSPS3
Official Registry DateJun 13, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Gáldar, belonging to the province of Palmas, Las (Canarias, Spain). The charging equipment and commercial operation belong to the Consejo Insular de la Energía de Gran Canaria network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeC2KHXR24EXLTAB6HSPS3
Post / EVSE Identifier #1H9ZAFYRAHCZ4RWGUXJJCBYGGSX8
Post / EVSE Identifier #2ES*MGC*ECIEGC0050*1
Post / EVSE Identifier #36f04f460-e853-11ef-8ee6-dd1e459a3f24
Post / EVSE Identifier #4SALRE0LS9U0XPGMVQAS0LFPYBVD
Post / EVSE Identifier #5ES*MGC*ECIEGC0050*2

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PERFIL DE CARGA ADMITIDO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.141226 | Lon: -15.664156View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
2.3 km away

62002061250003

Pl. De San Isidro, 36, 35488 San Isidro, Las
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
22 kW(Semi-fast)
2.5 km away

E-GC-Galdar-001

San Isidro,S/N
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.