20 kW• Semi-fast24/7Active in MITECO registry

Camp Llarg - Parc Central

Camp Llarg - Ctra. De Barcelona - Entrada Al Parc Central,0, Sant Andreu de la Barca (08740), Barcelona, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (4 plugs)
GPS Coordinates41.45149, 1.96972
Official ID8Q49VSMXT0ADKDWP77AI
Official Registry DateJun 09, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sant Andreu de la Barca, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:16 A
Tipo 2 (Mennekes)
20 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
2 connectors available
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:16 A
Tipo 2 (Mennekes)
20 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code8Q49VSMXT0ADKDWP77AI
Post / EVSE Identifier #1SRYAIADSJLVPAIAICIBGES5QVRE
Post / EVSE Identifier #2ES*IBD*E263874
Post / EVSE Identifier #3277092
Post / EVSE Identifier #4277091
Post / EVSE Identifier #5QP18KKMWVWDGQVFB0NS1DA7S55U
Post / EVSE Identifier #6ES*IBD*E263875
Post / EVSE Identifier #7277094
Post / EVSE Identifier #8277093

Theoretical Charging Times at Maximum Power (20 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h(~1 hours)
40 kWh Battery~2 h(~2 hours)
60 kWh Battery~3 h(~3 hours)
80 kWh Battery~4 h(~4 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.45149 | Lon: 1.96972View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)🅿️Parking
15.5 km away

APK2 Parking Imperial

Plaza Imperial S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.