55 kW• Fast24/7Active in MITECO registry

Camí Borges, 3

Carrer Cami Borges, 54, 25430 Juneda, Lleida, Spain, Juneda (25430), Lleida, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (3 plugs)
GPS Coordinates41.54704, 0.82865
Official ID1TWASUAFGJ6ABHS8TJQL
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Juneda, belonging to the province of Lleida (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A
CCS Combo 2
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:80 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code1TWASUAFGJ6ABHS8TJQL
Post / EVSE Identifier #1QBZC6PTGVRU7ZXGAUWLFXX44YJH
Post / EVSE Identifier #2ES*ETE*E1269
Post / EVSE Identifier #3322275
Post / EVSE Identifier #4322276
Post / EVSE Identifier #5PL9QLKRMWANQKRSK5NN76ZS1TVF
Post / EVSE Identifier #6ES*ETE*E1273
Post / EVSE Identifier #7322277

Theoretical Charging Times at Maximum Power (55 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~22 min(~0.4 hours)
40 kWh Battery~44 min(~0.7 hours)
60 kWh Battery~1 h 5 min(~1.1 hours)
80 kWh Battery~1 h 27 min(~1.5 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.547045 | Lon: 0.828654View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
10.1 km away

C6E06BCC22MUPJJNNE

L-702, 10, 25150 Artesa De Lleida, Lérida,
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
50 kW(Fast)
11.0 km away

61910009040001

Concesionario Servisimó - Av. Europa, 11
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.