22 kW• Semi-fast24/7Active in MITECO registry

Calle Arzobispo Morcillo 4

Calle Arzobispo Morcillo 4, Madrid (28029), Madrid, Spain
Network OperatorQWELLO España SL
Total Capacity4 bays (8 plugs)
GPS Coordinates40.48119, -3.69104
Official ID6A4GL9CKNCG3I0HNVGQB
Official Registry DateJan 20, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the QWELLO España SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A
2Charging Bay #2
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A
3Charging Bay #3
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A
4Charging Bay #4
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code6A4GL9CKNCG3I0HNVGQB
Post / EVSE Identifier #15LUPKYTZNB1CLLMWZSWGNUSHOUZ
Post / EVSE Identifier #2ES*AEQ*ESAEQE2FH3V11
Post / EVSE Identifier #3ESAEQE2FH3V11-22
Post / EVSE Identifier #4ESAEQE2FH3V11-11
Post / EVSE Identifier #5WQNOAABJIFDO87DSHMFY5UTLNAP
Post / EVSE Identifier #6ES*AEQ*ESAEQE2FH3V211
Post / EVSE Identifier #7ESAEQE2FH3V21 22
Post / EVSE Identifier #8ESAEQE2FH3V21 11
Post / EVSE Identifier #96UQ08I8HNRVDYEW2IPDLVMVMCEO
Post / EVSE Identifier #10ES*AEQ*ESAEQE2FH3V311
Post / EVSE Identifier #11ESAEQE2FH3V31 22
Post / EVSE Identifier #12ESAEQE2FH3V31 11
Post / EVSE Identifier #13YGFGW2URPW4IIKY8WEMAMUOQ8AK
Post / EVSE Identifier #14ES*AEQ*ESAEQE2FH3V411
Post / EVSE Identifier #15ESAEQE2FH3V41 22
Post / EVSE Identifier #16ESAEQE2FH3V41 11

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓COMPATIBLE CON TARJETAS CON CHIP
💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
📱Mobile App (Remote activation & eMSP roaming)
✓COMPATIBLE CON TARJETAS CONTACTLESS
📅Advance slot reservation supported

Accessibility & Amenities

Accessibility: SI. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.4811949 | Lon: -3.69104134View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
6.2 km away

M-ALCOBENDAS-009

Encinar De Los Reyes,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.