55 kW• Fast24/7Active in MITECO registry

Cabildo - EFACEC EdRR 3 Monumento Campesino

Ctra. Arrecife A Tinajo, 8, San Bartolomé (35559), Palmas, Las, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (3 plugs)
GPS Coordinates29.01517, -13.61564
Official IDC6MO2F42TIESJUOHNC12
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Bartolomé, belonging to the province of Palmas, Las (Canarias, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A
CHAdeMO
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeC6MO2F42TIESJUOHNC12
Post / EVSE Identifier #1KKLEQXP38DAMHHNMOZJRKWWBIPQ
Post / EVSE Identifier #2ES*ETE*E3956
Post / EVSE Identifier #3322500
Post / EVSE Identifier #4322501
Post / EVSE Identifier #5KG6MI9YH5BGXGHGPKTG0EVHPY3H
Post / EVSE Identifier #6ES*ETE*E3958
Post / EVSE Identifier #7322502

Theoretical Charging Times at Maximum Power (55 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~22 min(~0.4 hours)
40 kWh Battery~44 min(~0.7 hours)
60 kWh Battery~1 h 5 min(~1.1 hours)
80 kWh Battery~1 h 27 min(~1.5 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 29.015172 | Lon: -13.615638View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
6.5 km away

C6E15BCC22GNYBQKXF

Polígono Industrial De, Carretera
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
60 kW(Fast)
6.5 km away

C6E06BCC22FZRNHLVX

Polígono Industrial De, Carretera
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.