7.3 kW• Standard24/7Active in MITECO registry

BU-MERINDADDESOTOSCUEVA-001

Alto De San Bernabé,N/A, Merindad de Sotoscueva (09568), Burgos, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates43.03342, -3.66410
Official IDZXDCZMMVERZGOTO3YFFR
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Merindad de Sotoscueva, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.3 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.3 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeZXDCZMMVERZGOTO3YFFR
Post / EVSE Identifier #1NKI8QSXAGHGTBZRHOKWKVDSFVTV
Post / EVSE Identifier #2ES*IBD*E8872
Post / EVSE Identifier #39432
Post / EVSE Identifier #4KOVZOCWZHTCY1PFZ0SNUJQX5UEG
Post / EVSE Identifier #5ES*IBD*E8873
Post / EVSE Identifier #69433

Theoretical Charging Times at Maximum Power (7.3 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 44 min(~2.7 hours)
40 kWh Battery~5 h 29 min(~5.5 hours)
60 kWh Battery~8 h 13 min(~8.2 hours)
80 kWh Battery~10 h 58 min(~11 hours)

Opening Hours

24/7

Supported Payment Methods

📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.03342 | Lon: -3.6641View on OpenStreetMap →

Other Nearby Charging Stations

30 kW(Semi-fast)
6.7 km away

C6E15BCC22HZRYUGGE

Bu-V-5612, 09557 Puentedey, Burgos, Spain
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
11 kW(Semi-fast)
6.7 km away

22XP22T3KKJAK00219

Bu-V-5612, 09557 Puentedey, Burgos, Spain
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.