50 kW• Fast24/7Active in MITECO registry

BI-Muskiz-003

Estacion,9, Muskiz (48550), Bizkaia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity3 bays (4 plugs)
GPS Coordinates43.32211, -3.11295
Official ID2024004851
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Muskiz, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004851
Post / EVSE Identifier #1COD20240000039454PR00012597
Post / EVSE Identifier #2ES*IBD*E222780
Post / EVSE Identifier #3234773
Post / EVSE Identifier #4234772
Post / EVSE Identifier #5COD20240000039455PR00012598
Post / EVSE Identifier #6ES*IBD*E222781
Post / EVSE Identifier #7234774
Post / EVSE Identifier #8COD20240000039456PR00012599
Post / EVSE Identifier #9ES*IBD*E222782
Post / EVSE Identifier #10234775

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.322107 | Lon: -3.112952View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
6.5 km away

BI-Santurtzi-001

Puerto Pesquero,9
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7 kW(Standard)
6.8 km away

BI-Trapaga-002

Juan Sebastian Elkano,15
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
120 kW(Fast)🏬Centro Comercial
7.4 km away

Centro Comercial Ballonti (EXP)

Av. Ballonti, 1, 48920 Portugalete, Vizcaya,
Operator:Punto Recargas SL
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
30 points • 30 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.