7.4 kW• Semi-fast24/7Active in MITECO registry

BI-Gorliz-001

Elizalde Enparantza,1, Gorliz (48630), Bizkaia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates43.41544, -2.93246
Official ID2024006788
Official Registry DateNov 19, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Gorliz, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006788
Post / EVSE Identifier #1COD20240000045734PR00017546
Post / EVSE Identifier #2ES*IBD*E233943
Post / EVSE Identifier #3245820
Post / EVSE Identifier #4COD20240000045735PR00017547
Post / EVSE Identifier #5ES*IBD*E233944
Post / EVSE Identifier #6245821

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.41544 | Lon: -2.932458View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
5.6 km away

BI-Sopelana-001

Aldeko,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
50 kW(Fast)
7.4 km away

BI-Berango-001

Sabino Arana Zeharbide,50
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
22 kW(Semi-fast)
12.4 km away

BI-Santurtzi-001

Puerto Pesquero,9
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.