7.59 kW• Semi-fast24/7Active in MITECO registry

Barcelona - Provença

C/ Provença, 165, Barcelona (08036), Barcelona, Spain
Network OperatorP-APP & WEB SERVICIOS DIGITALES S.L.U.
Total Capacity10 bays (10 plugs)
GPS Coordinates41.39042, 2.15536
Official ID4EKNTQEVD2VDRFSC7MFG
Official Registry DateFeb 11, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Barcelona, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the P-APP & WEB SERVICIOS DIGITALES S.L.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
9Charging Bay #9
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code4EKNTQEVD2VDRFSC7MFG
Post / EVSE Identifier #189O0FKY4JTEA1NIJAIKMYUEKSAM
Post / EVSE Identifier #2ES*IPK*E6280222
Post / EVSE Identifier #31
Post / EVSE Identifier #4MDQR2GBKCQITCHLRE4SJFNEZYFV
Post / EVSE Identifier #5ES*IPK*E6280223
Post / EVSE Identifier #6XJQWQ2F8QBDI0MS84SMSCBNJHCS
Post / EVSE Identifier #7ES*IPK*E6280224
Post / EVSE Identifier #8YUWFZN4KMYPOFGQIEAOHZ8IU5UI
Post / EVSE Identifier #9ES*IPK*E6280225
Post / EVSE Identifier #10HANV1OP24C6KQVFNO5M7YB8HZYQ
Post / EVSE Identifier #11ES*IPK*E6280226
Post / EVSE Identifier #120LR7UNONENTX1MI0WVGX83SBGYW
Post / EVSE Identifier #13ES*IPK*E6280227
Post / EVSE Identifier #14SSSSH1USSD4BZXEU2QJQHNIXD0Z
Post / EVSE Identifier #15ES*IPK*E6280228
Post / EVSE Identifier #167JAT1ZO1G8VC7EAM4PS7BDM1KKH
Post / EVSE Identifier #17ES*IPK*E6280229
Post / EVSE Identifier #18HWUV5CZ22H60S3HDETTLITTFXSX
Post / EVSE Identifier #19ES*IPK*E6280220
Post / EVSE Identifier #20RZYCUWPFQ4ONAFM6HL5O8JK5Q6O
Post / EVSE Identifier #21ES*IPK*E6280221

Theoretical Charging Times at Maximum Power (7.59 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 38 min(~2.6 hours)
40 kWh Battery~5 h 16 min(~5.3 hours)
60 kWh Battery~7 h 54 min(~7.9 hours)
80 kWh Battery~10 h 32 min(~10.5 hours)

Opening Hours

Martes (00:00 - 00:00) Lunes (00:00 - 00:00) Sabado (00:00 - 00:00) Jueves (00:00 - 00:00) Viernes (00:00 - 00:00) Domingo (00:00 - 00:00) Miercoles (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.39042 | Lon: 2.15536View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
620 m away

APK2 Centric BCN

Aragó 252
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
3.3 km away

APK2 Plaza del Mar

Passeig De Joan De Borbón 78
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.