55 kW• Fast24/7Active in MITECO registry

Banyoles - LAFON EdRR 1

C-150A, 17820 Bañolas, Girona, Spain, Banyoles (17820), Girona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (3 plugs)
GPS Coordinates42.12587, 2.76232
Official IDZHFI4XOEI8BZ2DDWZG2K
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Banyoles, belonging to the province of Girona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A
CCS Combo 2
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:80 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeZHFI4XOEI8BZ2DDWZG2K
Post / EVSE Identifier #1WKANDNGKEYIO4ECYRFQBMVIP4AW
Post / EVSE Identifier #2ES*ETE*E757
Post / EVSE Identifier #3322112
Post / EVSE Identifier #4322113
Post / EVSE Identifier #5BUN88TGTGLGHDD41SMTR1FBE0HR
Post / EVSE Identifier #6ES*ETE*E765
Post / EVSE Identifier #7322114

Theoretical Charging Times at Maximum Power (55 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~22 min(~0.4 hours)
40 kWh Battery~44 min(~0.7 hours)
60 kWh Battery~1 h 5 min(~1.1 hours)
80 kWh Battery~1 h 27 min(~1.5 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.125869 | Lon: 2.762317View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)🛒Supermercado Mercadona
1.7 km away

3940 - MERCADONA

Farga,40
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
7.0 km away

GI-Vilademuls-001

Motees,N/A
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
60 kW(Fast)
8.1 km away

PETRO PALOL, S.L.

CTRA. C-66, KM. 38
Operator:PETRO PALOL, S.L.
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.