50 kW• Fast24/7Active in MITECO registry

B-SantBoideLlobregat-004

Marina,2, Sant Boi de Llobregat (08830), Barcelona, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (4 plugs)
GPS Coordinates41.33442, 2.05125
Official ID2024000475
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sant Boi de Llobregat, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000475
Post / EVSE Identifier #1COD20240000018678PR00001393
Post / EVSE Identifier #2ES*IBD*E11276
Post / EVSE Identifier #311877
Post / EVSE Identifier #411876
Post / EVSE Identifier #5COD20240000018679PR00001394
Post / EVSE Identifier #6ES*IBD*E11277
Post / EVSE Identifier #711879
Post / EVSE Identifier #811878

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
💳RFID Card / Keyfob reader
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.334416 | Lon: 2.051254View on OpenStreetMap →

Other Nearby Charging Stations

25 kW(Semi-fast)
3.1 km away

KIA Deltaprat

Cerdanya 46
Operator:EDP CLIENTES SAU
CCS Combo 2
1 point • 1 plug
Details
100 kW(Fast)🏬Centro Comercial
5.6 km away

Centro Comercial Barnasud

Carrer del Progrés, 69, 08850 Gavà, Barcelo
Operator:Punto Recargas SL
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 5 plugs
Details
12 kW(Semi-fast)🏬Centro Comercial
5.6 km away

Centro Comercial Barnasud (EXP)

Carrer del Progrés, 69, 08850 Gavà, Barcelo
Operator:Punto Recargas SL
Tipo 2 (Mennekes)
20 points • 20 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.