100 kW• Fast24/7Active in MITECO registry

B+ ENERGIAS SUECA

Carrer d'Arnau de Vilanova, 7, Sueca (46410), Valencia/València, Spain
Network OperatorPowergo Public SL
Total Capacity1 bay (1 plug)
GPS Coordinates39.20267, -0.30527
Official ID2024003558
Official Registry DateMay 22, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sueca, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the Powergo Public SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 3C
⚡ 800V100 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:1000 V (Alta Tensión)
Amperage:320 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003558
Post / EVSE Identifier #1COD20240000031563PR00008688
Post / EVSE Identifier #2ES*PGO*ECO00002
Post / EVSE Identifier #3ES*PGO*ECO00002*1

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Accessibility: NO. Additional amenities: SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.20267 | Lon: -0.30527View on OpenStreetMap →

Other Nearby Charging Stations

12 kW(Semi-fast)
4.8 km away

Aquopolis Cullera

Antigua Carretera Nazaret-Oliva, km. 33, 4640
Operator:Punto Recargas SL
Tipo 2 (Mennekes)
13 points • 13 plugs
Details
120 kW(Fast)🛒Supermercado Consum
8.3 km away

SM Consum - El Perello 7

Roger De Lauria, 19
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
3 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.