8.4 kW• Semi-fast24/7Active in MITECO registry

AYUNTAMIENTO DE COCENTAINA

Avenida País Valencia, 89 Cocentaina, Alicante, Cocentaina (03820), Alicante/Alacant, Spain
Network OperatorFENIE ENERGIA, SA
Total Capacity1 bay (4 plugs)
GPS Coordinates38.74138, -0.43859
Official ID2024006697
Official Registry DateNov 12, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cocentaina, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the FENIE ENERGIA, SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
4 connectors available
Schuko (Enchufe doméstico)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
8.2 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:12 A
Schuko (Enchufe doméstico)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
8.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:12 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006697
Post / EVSE Identifier #1COD20240000045407PR00017400
Post / EVSE Identifier #2ES*FEN*E*0424
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53
Post / EVSE Identifier #64

Theoretical Charging Times at Maximum Power (8.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 23 min(~2.4 hours)
40 kWh Battery~4 h 46 min(~4.8 hours)
60 kWh Battery~7 h 9 min(~7.1 hours)
80 kWh Battery~9 h 31 min(~9.5 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
📅Advance slot reservation supported
🔓Remote plug unlock supported

Accessibility & Amenities

Accessibility: SI. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.7413777 | Lon: -0.43859166View on OpenStreetMap →

Other Nearby Charging Stations

30 kW(Semi-fast)🛒Supermercado Consum
430 m away

SM Consum - Av. d'Antoni Almela

Avenida De Antonio Ramos Carratalá
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
2 points • 2 plugs
Details
60 kW(Fast)🛒Supermercado Consum
5.8 km away

CONSUM ALCOY

AVENIDA DE LA ALAMEDA, 17
Operator:REMO SUSTAINABLE MOBILITY S.L
CCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.