22 kW• Semi-fast24/7Active in MITECO registry

Ayuntamiento de Arroniz

Ctra. BARBARIN nº 38, VILLA DE ARRÓNIZ Arróniz, Navarra, Arróniz (31243), Navarra, Spain
Network OperatorFENIE ENERGIA, SA
Total Capacity1 bay (2 plugs)
GPS Coordinates42.58920, -2.09601
Official ID2024006518
Official Registry DateOct 28, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Arróniz, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the FENIE ENERGIA, SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Schuko (Enchufe doméstico)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006518
Post / EVSE Identifier #1COD20240000044608PR00016733
Post / EVSE Identifier #2ES*FEN*E*0183
Post / EVSE Identifier #31
Post / EVSE Identifier #42

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

🔓Remote plug unlock supported
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Accessibility: SI. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.589196 | Lon: -2.096009View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
9.2 km away

20XM32T8KK3AR00018

Mainate - Calle Merkatondoa, 28
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
22 kW(Semi-fast)
9.2 km away

E-NA-Estella-001

Merkatondoa,33
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
100 kW(Fast)
9.3 km away

Auto Ega - Estella

Merkatondoa,29
Operator:CHARGING TOGETHER SL
CCS Combo 2Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.