100 kW• Fast24/7Active in MITECO registry

Avda. Ronda de Pío XII. Sevilla

Avenida Ronda De Pio Xii, 4, Sevilla (41008), Sevilla, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates37.40637, -5.97674
Official ID2024006527
Official Registry DateOct 28, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sevilla, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006527
Post / EVSE Identifier #1COD20240000044674PR00016798
Post / EVSE Identifier #2ES*WEN*ESEVPIOXII12
Post / EVSE Identifier #382f67c5f-f332-d8bd-4b18-61a755b4c6e8
Post / EVSE Identifier #4COD20240000044675PR00016799
Post / EVSE Identifier #5ES*WEN*ESEVPIOXII11
Post / EVSE Identifier #641467afa-0451-f747-79df-056929426fe4

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.406365 | Lon: -5.976738View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
2.5 km away

Senda 5

Carretera Sevilla, 5, 41015 Sevilla, Spain
Operator:Punto Recargas SL
CCS Combo 2
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
2.5 km away

APK2 Magdalena

San Pablo 1
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.