120 kW• Fast24/7Active in MITECO registry

Av. La Ferreria - Progrés

Ferreria (La),86, Montcada i Reixac (08110), Barcelona, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (6 plugs)
GPS Coordinates41.48494, 2.17826
Official ID2025000197
Official Registry DateFeb 10, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Montcada i Reixac, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
3Charging Bay #3
2 connectors available
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:16 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
2 connectors available
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:16 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000197
Post / EVSE Identifier #1COD20250000048963PR00000595
Post / EVSE Identifier #2ES*IBD*E262066
Post / EVSE Identifier #3275236
Post / EVSE Identifier #4COD20250000048964PR00000596
Post / EVSE Identifier #5ES*IBD*E262067
Post / EVSE Identifier #6275237
Post / EVSE Identifier #7COD20250000048965PR00000597
Post / EVSE Identifier #8ES*IBD*E262064
Post / EVSE Identifier #9275233
Post / EVSE Identifier #10275232
Post / EVSE Identifier #11COD20250000048966PR00000598
Post / EVSE Identifier #12ES*IBD*E262065
Post / EVSE Identifier #13275235
Post / EVSE Identifier #14275234

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.48494 | Lon: 2.17826View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.