55 kW• Fast24/7Active in MITECO registry

Av. Generalitat 72

Av. De La Generalitat, 101, 43500 Tortosa, Tarragona, Spain, Tortosa (43500), Tarragona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (3 plugs)
GPS Coordinates40.80756, 0.52012
Official ID2ZH9O5N5IIPDMIM9E4YB
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tortosa, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:80 A
2Charging Bay #2
2 connectors available
CCS Combo 2
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A
CHAdeMO
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2ZH9O5N5IIPDMIM9E4YB
Post / EVSE Identifier #1KSKDTW6K6NSI7OPDZGDJTLDJH9G
Post / EVSE Identifier #2ES*ETE*E236
Post / EVSE Identifier #3321794
Post / EVSE Identifier #4UO1SGEU6480DHIJB2SMNIFPZO0E
Post / EVSE Identifier #5ES*ETE*E237
Post / EVSE Identifier #6321795
Post / EVSE Identifier #7321796

Theoretical Charging Times at Maximum Power (55 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~22 min(~0.4 hours)
40 kWh Battery~44 min(~0.7 hours)
60 kWh Battery~1 h 5 min(~1.1 hours)
80 kWh Battery~1 h 27 min(~1.5 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.807565 | Lon: 0.520117View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
760 m away

E-T-Tortosa-004

De L'estadi,5
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
900 m away

T-TORTOSA-001

De La Generalitat,195
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
1.4 km away

T-Tortosa-002

De La Ciutat,S/N
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.