7 kW• Standard24/7Active in MITECO registry

Av. de la Font, 62-64

Av. De La Font, 64, 43881 Cunit, Tarragona, Spain, Albinyana (43881), Tarragona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (2 plugs)
GPS Coordinates41.19613, 1.63367
Official ID1TWGXRMR0MR9HRXPI32Y
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Albinyana, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code1TWGXRMR0MR9HRXPI32Y
Post / EVSE Identifier #1CJSGKRPWQK5QNOJZ9HNTS9T1MCW
Post / EVSE Identifier #2ES*ETE*E425
Post / EVSE Identifier #3321950
Post / EVSE Identifier #4G8I6UYHTN2RZYSW2FYLIUNFERG2
Post / EVSE Identifier #5ES*ETE*E426
Post / EVSE Identifier #6321951

Theoretical Charging Times at Maximum Power (7 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 51 min(~2.9 hours)
40 kWh Battery~5 h 43 min(~5.7 hours)
60 kWh Battery~8 h 34 min(~8.6 hours)
80 kWh Battery~11 h 26 min(~11.4 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.196133 | Lon: 1.633675View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
8.1 km away

T-ElVendrell-005

Barcelona,1
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2CHAdeMO
2 points • 3 plugs
Details
22 kW(Semi-fast)
9.3 km away

E-T-ElVendrell-001

Estiu,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
22 kW(Semi-fast)
9.5 km away

E-T-ElVendrell-002

De Miquel Batllori I Munné,4
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.