150 kW• Ultra-fast24/7Active in MITECO registry

Autocas Mercedes-Benz Castellón

Network OperatorCHARGING TOGETHER SL
Total Capacity6 bays (8 plugs)
GPS Coordinates39.97825, -0.07722
Official ID2025000598
Official Registry DateMar 12, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Castelló de la Plana/Castellón de la Plana, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:375 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:375 A
3Charging Bay #3
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
4Charging Bay #4
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000598
Post / EVSE Identifier #1COD20250000051281PR00002259
Post / EVSE Identifier #2ES*FCT*E228443
Post / EVSE Identifier #3240423
Post / EVSE Identifier #4COD20250000051282PR00002260
Post / EVSE Identifier #5ES*FCT*E228444
Post / EVSE Identifier #6240424
Post / EVSE Identifier #7COD20250000051283PR00002261
Post / EVSE Identifier #8ES*FCT*E228445
Post / EVSE Identifier #9240426
Post / EVSE Identifier #10240425
Post / EVSE Identifier #11COD20250000051284PR00002262
Post / EVSE Identifier #12ES*FCT*E228446
Post / EVSE Identifier #13240428
Post / EVSE Identifier #14240427
Post / EVSE Identifier #15COD20250000051285PR00002263
Post / EVSE Identifier #16ES*FCT*E228447
Post / EVSE Identifier #17240429
Post / EVSE Identifier #18COD20250000051286PR00002264
Post / EVSE Identifier #19ES*FCT*E228448
Post / EVSE Identifier #20240430

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.978248 | Lon: -0.077218View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
470 m away

CS-Castellondelaplana-013

Europa (Ciudad Del Transporte),1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.