150 kW• Ultra-fast24/7Active in MITECO registry

AUDI MOHISA ÁVILA - Concesionario Audi

Burgohondo,18, Ávila (05002), Ávila, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (2 plugs)
GPS Coordinates40.64626, -4.70534
Official ID4HRF7C84FT2LJYIFZIBM
Official Registry DateJun 30, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ávila, belonging to the province of Ávila (Castilla y León, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:350 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:350 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code4HRF7C84FT2LJYIFZIBM
Post / EVSE Identifier #1IGEXLH4SDGTPHOWUJ2PNA8QRYQQ
Post / EVSE Identifier #2ES*FCT*E229327
Post / EVSE Identifier #3241434
Post / EVSE Identifier #4CMH1ZDKV1ZB18XZUKDG1SDA6PCX
Post / EVSE Identifier #5ES*FCT*E229328
Post / EVSE Identifier #6241435

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.646264 | Lon: -4.70534View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)
0 m away

E-AV-Avila-002

Burgohondo,18
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
100 kW(Fast)
730 m away

AV-AVILA-009

Juan Pablo Ii,14
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.