300 kW• Ultra-fast24/7Active in MITECO registry

AUDI MARZÁ - Avenida de Lairón 60

Lairon (Ciudad Del Transporte),60, Castelló de la Plana/Castellón de la Plana (12006), Castellón/Castelló, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (2 plugs)
GPS Coordinates39.97372, -0.07066
Official IDCZ34QMVCAJKZC5D1KUQP
Official Registry DateJan 30, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Castelló de la Plana/Castellón de la Plana, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V300 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:300 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V300 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeCZ34QMVCAJKZC5D1KUQP
Post / EVSE Identifier #1Y6GL23N49CD3BVAYI0G75BBBRXT
Post / EVSE Identifier #2ES*FCT*E232035
Post / EVSE Identifier #3244287
Post / EVSE Identifier #4XQ1CMSIFVD2EW0R98IJKZJWMDEC
Post / EVSE Identifier #5ES*FCT*E232036
Post / EVSE Identifier #6244288

Theoretical Charging Times at Maximum Power (300 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~4 min(~0.1 hours)
40 kWh Battery~8 min(~0.1 hours)
60 kWh Battery~12 min(~0.2 hours)
80 kWh Battery~16 min(~0.3 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.973717 | Lon: -0.070658View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
340 m away

CS-Castellondelaplana-013

Europa (Ciudad Del Transporte),1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.