55 kW• Fast24/7Active in MITECO registry

Artesa de Segre

Carrer Del Camp De Futbol, 1, Artesa de Segre (25730), Lleida, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (3 plugs)
GPS Coordinates41.89601, 1.04340
Official IDNOOMNSAM0JN2KYRSVDBC
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Artesa de Segre, belonging to the province of Lleida (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:80 A
2Charging Bay #2
2 connectors available
CCS Combo 2
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A
CHAdeMO
55 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:80 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeNOOMNSAM0JN2KYRSVDBC
Post / EVSE Identifier #1F49JRZWDT3QETMIE24FAFCLPEMX
Post / EVSE Identifier #2ES*ETE*E16183
Post / EVSE Identifier #3325840
Post / EVSE Identifier #4MT61T8KAI1XN0VPJ6EDRM3ZM2DI
Post / EVSE Identifier #5ES*ETE*E16185
Post / EVSE Identifier #6325842
Post / EVSE Identifier #7325841

Theoretical Charging Times at Maximum Power (55 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~22 min(~0.4 hours)
40 kWh Battery~44 min(~0.7 hours)
60 kWh Battery~1 h 5 min(~1.1 hours)
80 kWh Battery~1 h 27 min(~1.5 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.896007 | Lon: 1.043397View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
8.6 km away

62047041180007

Carretera Lleida Puigcerdà Km 40
Operator:ENDESA X WAY, S.L.
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
3 points • 3 plugs
Details
55 kW(Fast)
11.9 km away

Plaça Sant Cristòfol, sn

Avinguda Font De Valldans, 1, 25740 Ponts, Lérida, Spain
Operator:Etecnic Movilidad Electrica, SRL
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.