250 kW• Ultra-fast24/7Active in MITECO registry

Ariza, Spain

Carretera De Madrid, 197, Ariza (50220), Zaragoza, Spain
Network OperatorTesla Spain SLU
Total Capacity12 bays (12 plugs)
GPS Coordinates41.31299, -2.00221
Official ID2024006397
Official Registry DateOct 22, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ariza, belonging to the province of Zaragoza (Aragón, Spain). The charging equipment and commercial operation belong to the Tesla Spain SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
2Charging Bay #2
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
3Charging Bay #3
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
4Charging Bay #4
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
5Charging Bay #5
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
6Charging Bay #6
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
7Charging Bay #7
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
8Charging Bay #8
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
9Charging Bay #9
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
10Charging Bay #10
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
11Charging Bay #11
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A
12Charging Bay #12
1 connector available
CCS Combo 2
250 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:470 V
Amperage:780 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006397
Post / EVSE Identifier #1COD20240000043864PR00016001
Post / EVSE Identifier #2ES*TSL*E0EIABF
Post / EVSE Identifier #3a8094b1f-e437-4907-8871-74337ce15e85
Post / EVSE Identifier #4COD20240000043865PR00016002
Post / EVSE Identifier #5ES*TSL*E0EIB12
Post / EVSE Identifier #6c67b46c8-9240-4b86-91f1-532aa5f75bd5
Post / EVSE Identifier #7COD20240000043866PR00016003
Post / EVSE Identifier #8ES*TSL*E0EI9YP
Post / EVSE Identifier #9e29c789b-e26b-4b19-a731-db903606fbf8
Post / EVSE Identifier #10COD20240000043867PR00016004
Post / EVSE Identifier #11ES*TSL*E0EIABC
Post / EVSE Identifier #1293bfdec6-241a-477c-9478-8d5f0a3fe929
Post / EVSE Identifier #13COD20240000043868PR00016005
Post / EVSE Identifier #14ES*TSL*E0EIABD
Post / EVSE Identifier #15b9535e57-930f-4e87-8c77-ed694a44f5e2
Post / EVSE Identifier #16COD20240000043869PR00016006
Post / EVSE Identifier #17ES*TSL*E0EIABE
Post / EVSE Identifier #184c74163c-21e8-45d1-8b75-6540c93bf328
Post / EVSE Identifier #19COD20240000043870PR00016007
Post / EVSE Identifier #20ES*TSL*E0EIB14
Post / EVSE Identifier #2142ba6498-5fdc-4ca4-bf67-18160e24b249
Post / EVSE Identifier #22COD20240000043871PR00016008
Post / EVSE Identifier #23ES*TSL*E0EI9YO
Post / EVSE Identifier #2433401d3c-8021-48cd-a362-6efcf84e4745
Post / EVSE Identifier #25COD20240000043872PR00016009
Post / EVSE Identifier #26ES*TSL*E0EI9YQ
Post / EVSE Identifier #272db8bbcc-8626-4107-85fd-d230a3c1c4e5
Post / EVSE Identifier #28COD20240000043873PR00016010
Post / EVSE Identifier #29ES*TSL*E0EI9YR
Post / EVSE Identifier #307005cf7d-fa2e-4938-97d2-5830cf706278
Post / EVSE Identifier #31COD20240000043874PR00016011
Post / EVSE Identifier #32ES*TSL*E0EIB11
Post / EVSE Identifier #33f17fef0c-88aa-4f88-98c5-94955b33f44d
Post / EVSE Identifier #34COD20240000043875PR00016012
Post / EVSE Identifier #35ES*TSL*E0EIB13
Post / EVSE Identifier #3633eb83a1-154b-4f86-a3ae-e6698474a5fe

Theoretical Charging Times at Maximum Power (250 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~5 min(~0.1 hours)
40 kWh Battery~10 min(~0.2 hours)
60 kWh Battery~14 min(~0.2 hours)
80 kWh Battery~19 min(~0.3 hours)

Opening Hours

Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

✓COMPATIBLE CON TARJETAS CONTACTLESS
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.312988 | Lon: -2.002211View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
60 m away

ACCIONA - El Aral

8X7w+7V Ariza, España
Operator:ACCIONA Recarga
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 3 plugs
Details
350 kW(Ultra-fast)
60 m away

IONITY Ariza Norte

A-2 Km 197,1
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
4 points • 4 plugs
Details
350 kW(Ultra-fast)
200 m away

IONITY Ariza Sur

A-2 Km 197,1
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.