22 kW• Semi-fast🅿️ParkingHorario habitualActive in MITECO registry

Aparcamiento polideportivo y piscina municipal

Cl Carretera Nacional 634 S/N, Siero (33580), Asturias, Spain
Network OperatorEDISON NEXT SPAIN SLU
Total Capacity4 bays (8 plugs)
GPS Coordinates43.39256, -5.64949
Official ID2025000308
Official Registry DateFeb 19, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Siero, belonging to the province of Asturias (Asturias, Principado de, Spain). The charging equipment and commercial operation belong to the EDISON NEXT SPAIN SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000308
Post / EVSE Identifier #1COD20250000049043PR00001347
Post / EVSE Identifier #2ES*EDX*ECIA0010
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #5COD20250000049044PR00001348
Post / EVSE Identifier #6ES*EDX*ECIA0011
Post / EVSE Identifier #7COD20250000049045PR00001349
Post / EVSE Identifier #8ES*EDX*ECIA0012
Post / EVSE Identifier #9COD20250000049046PR00001350
Post / EVSE Identifier #10ES*EDX*ECIA0013

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (00:00 - 00:00) Lunes (00:00 - 00:00) Sabado (00:00 - 00:00) Martes (00:00 - 00:00) Jueves (00:00 - 00:00) Viernes (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

✓COMPATIBLE CON TARJETAS CONTACTLESS

Accessibility & Amenities

Accessibility: SI.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.392559 | Lon: -5.649494View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
12.6 km away

E-33-Amieva-001

Autovia A,66
Operator:IBERDROLA CLIENTES S.A.U
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
2 points • 4 plugs
Details
7 kW(Standard)
13.1 km away

O-Oviedo-016

Peña Santa (Pg.Silvota),15
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
10 points • 10 plugs
Details
320 kW(Ultra-fast)
13.5 km away

Centro Porsche Asturias CP 2

Pol. Industrial Los Peñones 18
Operator:Ibérica de Tecnología y Servicios de Automoción, S.L.
CCS Combo 2
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.