22 kW• Semi-fast🅿️Parking24/7Active in MITECO registry

Aparcamiento Av. José Tartiere

Av . Jose Tartiere S/N, Siero (33420), Asturias, Spain
Network OperatorEDISON NEXT SPAIN SLU
Total Capacity1 bay (2 plugs)
GPS Coordinates43.40221, -5.81092
Official ID3I2SQL4DTXUZQWVREHQF
Official Registry DateApr 15, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Siero, belonging to the province of Asturias (Asturias, Principado de, Spain). The charging equipment and commercial operation belong to the EDISON NEXT SPAIN SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code3I2SQL4DTXUZQWVREHQF
Post / EVSE Identifier #1P5A4SVIKGLOMCBD59SBUUIUIYQJ
Post / EVSE Identifier #2ES*EDX*ECIA0020
Post / EVSE Identifier #31
Post / EVSE Identifier #42

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓COMPATIBLE CON TARJETAS CONTACTLESS

Accessibility & Amenities

Accessibility: SI. Additional amenities: INSTALACIÓN DEPORTIVA

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.402205 | Lon: -5.8109207View on OpenStreetMap →

Other Nearby Charging Stations

320 kW(Ultra-fast)
930 m away

Centro Porsche Asturias CP 2

Pol. Industrial Los Peñones 18
Operator:Ibérica de Tecnología y Servicios de Automoción, S.L.
CCS Combo 2
1 point • 1 plug
Details
320 kW(Ultra-fast)
930 m away

Centro Porsche Asturias CP 1

Pol. Industrial Los Peñones 18
Operator:Ibérica de Tecnología y Servicios de Automoción, S.L.
CCS Combo 2
1 point • 1 plug
Details
7 kW(Standard)
1.5 km away

O-Oviedo-016

Peña Santa (Pg.Silvota),15
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
10 points • 10 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.