120 kW• Fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Aparcament Central

Rnda Can Rabada Hotel Portal,13, Castelldefels (08860), Barcelona, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (6 plugs)
GPS Coordinates41.28183, 1.98468
Official ID9JU9QHGSYVZJVRWLNPHJ
Official Registry DateJun 09, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Castelldefels, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
3Charging Bay #3
2 connectors available
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:16 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
2 connectors available
Schuko (Enchufe doméstico)
3.6 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:16 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code9JU9QHGSYVZJVRWLNPHJ
Post / EVSE Identifier #1B54ZSJPVPOLORCE5T8SAI3OAFKI
Post / EVSE Identifier #2ES*IBD*E262286
Post / EVSE Identifier #3275454
Post / EVSE Identifier #46LRGNX9CK3FNYQSRE4M9RRRGMIV
Post / EVSE Identifier #5ES*IBD*E262287
Post / EVSE Identifier #6275455
Post / EVSE Identifier #7HCCBP8O1PXVF1WMW1I3MVIQY6WU
Post / EVSE Identifier #8ES*IBD*E262268
Post / EVSE Identifier #9275437
Post / EVSE Identifier #10275436
Post / EVSE Identifier #11ZVS0ZS9FMZO9JTKQHZOZKEYJJP0
Post / EVSE Identifier #12ES*IBD*E262269
Post / EVSE Identifier #13275439
Post / EVSE Identifier #14275438

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.28183 | Lon: 1.984676View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)🏨Hotel / Alojamiento
120 m away

Hotel IBIS Castelldefels

Passeo Del Ferrocarril, 342
Operator:Punto Recargas SL
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
8 points • 8 plugs
Details
100 kW(Fast)🏬Centro Comercial
2.5 km away

Centro Comercial Barnasud

Carrer del Progrés, 69, 08850 Gavà, Barcelo
Operator:Punto Recargas SL
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 5 plugs
Details
12 kW(Semi-fast)🏬Centro Comercial
2.5 km away

Centro Comercial Barnasud (EXP)

Carrer del Progrés, 69, 08850 Gavà, Barcelo
Operator:Punto Recargas SL
Tipo 2 (Mennekes)
20 points • 20 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.