100 kW• Fast24/7Active in MITECO registry

AN Energéticos Malagón

Fundadores De La Cooperativa,69, Malagón (13420), Ciudad Real, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (2 plugs)
GPS Coordinates39.16686, -3.85243
Official IDXABLEDJ0Z6L0X3196ZWK
Official Registry DateAug 07, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Malagón, belonging to the province of Ciudad Real (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:500 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:500 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeXABLEDJ0Z6L0X3196ZWK
Post / EVSE Identifier #1UWUXQXJ2YKVXWIDGQF2SAIKABYJ
Post / EVSE Identifier #2ES*FCT*E232317
Post / EVSE Identifier #3244569
Post / EVSE Identifier #4YXLHSNICHZZUZKFMHPJTWC0FPXE
Post / EVSE Identifier #5ES*FCT*E232318
Post / EVSE Identifier #6244570

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.16686 | Lon: -3.85243View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
19.6 km away

E-CR-CiudadReal-002

Toledo,3
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
22 kW(Semi-fast)
20.1 km away

E-13-CiudadReal-001

Industrial El Avanzado,63
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
80 kW(Fast)
20.8 km away

E-Leclerc Ciudad Real

Carr. De Porzuna, 24, 13005 Ciudad Real, Spai
Operator:Punto Recargas SL
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
10 points • 10 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.