98 kW• Fast🛒Supermercado Aldi24/7Active in MITECO registry

Aldi Sevilla Pino Montano

C. Ganímedes, 3, Sevilla (41015), Sevilla, Spain
Network OperatorAtlante Iberia SL
Total Capacity2 bays (4 plugs)
GPS Coordinates37.43313, -5.96753
Official ID2025000376
Official Registry DateMar 05, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sevilla, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the Atlante Iberia SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
98 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
98 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
2 connectors available
CCS Combo 2
98 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
98 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000376
Post / EVSE Identifier #1COD20250000049211PR00001493
Post / EVSE Identifier #2ES*ATE*EE20092
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #5COD20250000049212PR00001494
Post / EVSE Identifier #6ES*ATE*EE20091

Theoretical Charging Times at Maximum Power (98 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~37 min(~0.6 hours)
80 kWh Battery~49 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN
📱Mobile App (Remote activation & eMSP roaming)
✓PERFIL DE CARGA ADMITIDO

Accessibility & Amenities

Accessibility: SI. Additional amenities: SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.4331299 | Lon: -5.96753263View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
620 m away

Senda 5

Carretera Sevilla, 5, 41015 Sevilla, Spain
Operator:Punto Recargas SL
CCS Combo 2
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
5.4 km away

APK2 Magdalena

San Pablo 1
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.