22 kW• Semi-fast24/7Active in MITECO registry

Ajuntament de Sant Feliu de Codines - SELBA EdRSR 3 - 4

Avinguda Generalitat, 1, Sant Feliu de Codines (08182), Barcelona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity4 bays (4 plugs)
GPS Coordinates41.68916, 2.16464
Official IDLZN4E4ROC2KBVD6CFLM7
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sant Feliu de Codines, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:64 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:64 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeLZN4E4ROC2KBVD6CFLM7
Post / EVSE Identifier #1RV8CUDNSQQWKAFGW20YXI0TWWTW
Post / EVSE Identifier #2ES*ETE*E66145
Post / EVSE Identifier #3100077267
Post / EVSE Identifier #4EQMHU1ZCGX5I6JONPBXHXB4V3OS
Post / EVSE Identifier #5ES*ETE*E66146
Post / EVSE Identifier #6100077268
Post / EVSE Identifier #7P2YGPUX7R2MX46HFKTQWVZWPSIY
Post / EVSE Identifier #8ES*ETE*E66147
Post / EVSE Identifier #9100077269
Post / EVSE Identifier #10XMBNIWIKFXC6GMLBFA7TWW5LWGJ
Post / EVSE Identifier #11ES*ETE*E66148
Post / EVSE Identifier #12100077270

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.68916 | Lon: 2.164644View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
5.8 km away

Zona LES CREMADES

Zona Esportiva Les Cremades, 08140, Barcelona, Espanya
Operator:ELECSUM FOTOVOLTAICA, S.L.U.
Tipo 2 (Mennekes)Schuko (Enchufe doméstico)
2 points • 4 plugs
Details
22 kW(Semi-fast)
6.1 km away

Balneari TERMES VICTÒRIA

Carrer De Barcelona, 12, 08140 Caldes De Montbui, Barcelona, Espanya
Operator:ELECSUM FOTOVOLTAICA, S.L.U.
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
50 kW(Fast)
9.8 km away

Gasuir La Garriga

C-17
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.