22 kW• Semi-fast24/7Active in MITECO registry

AhorraMas Ocaña

Av. De José Antonio 13, Ocaña (45300), Toledo, Spain
Network OperatorEDP CLIENTES SAU
Total Capacity1 bay (2 plugs)
GPS Coordinates39.95763, -3.49691
Official ID2023002375
Official Registry DateAug 31, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ocaña, belonging to the province of Toledo (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the EDP CLIENTES SAU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002375
Post / EVSE Identifier #1COD20230000011814PR00000830
Post / EVSE Identifier #2ES*EDP*E00274
Post / EVSE Identifier #31
Post / EVSE Identifier #42

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Accessibility: SI. Additional amenities: SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.95763 | Lon: -3.496912View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
980 m away

Rest. Arrocería Martín

Ctra. De Andalucía, Km 62
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
250 kW(Ultra-fast)
2.7 km away

Ocaña, Spain

A-4, P.K. 64
Operator:Tesla Spain SLU
CCS Combo 2
8 points • 8 plugs
Details
50 kW(Fast)
4.4 km away

TO-Ocaña-002

Autovia A-4,57
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
4 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.