100 kW• Fast24/7Active in MITECO registry

Admon. Hacienda Ciudad Rodrigo

De Béjar,36, Ciudad Rodrigo (37500), Salamanca, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (2 plugs)
GPS Coordinates40.59879, -6.52792
Official ID2025000569
Official Registry DateMar 12, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ciudad Rodrigo, belonging to the province of Salamanca (Castilla y León, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000569
Post / EVSE Identifier #1COD20250000051119PR00002097
Post / EVSE Identifier #2ES*FCT*E228879
Post / EVSE Identifier #3240906
Post / EVSE Identifier #4COD20250000051120PR00002098
Post / EVSE Identifier #5ES*FCT*E228880
Post / EVSE Identifier #6240907

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.598787 | Lon: -6.527923View on OpenStreetMap →

Other Nearby Charging Stations

11 kW(Semi-fast)
190 m away

22XP22T3KKJAK00282

Avenida Bejar Sn, Ciudad Rodrigo, 37500
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)⛽Estación Repsol
550 m away

Repsol ES, CRED Ciudad Rodrigo

Cr N-620, 324 I
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.