60 kW• Fast24/7Active in MITECO registry

ACCIONA - Villamuriel de Cerrato - Avenida Aguilera

Avenida Aguilera, 10A, Villamuriel de Cerrato (34190), Palencia, Spain
Network OperatorACCIONA Recarga
Total Capacity3 bays (3 plugs)
GPS Coordinates41.94872, -4.51370
Official ID2024004381
Official Registry DateJun 21, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Villamuriel de Cerrato, belonging to the province of Palencia (Castilla y León, Spain). The charging equipment and commercial operation belong to the ACCIONA Recarga network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:380 V
Amperage:16 A
2Charging Bay #2
1 connector available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:150 A
3Charging Bay #3
1 connector available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:150 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004381
Post / EVSE Identifier #1COD20240000036358PR00011493
Post / EVSE Identifier #2ES*ARE*EZLKNQTQ713XXKBQ1
Post / EVSE Identifier #35b9247e28636fa39f4adb80d
Post / EVSE Identifier #4COD20240000036359PR00011494
Post / EVSE Identifier #5ES*ARE*E5RZXUTZBHTIGHHQ5
Post / EVSE Identifier #65b9247e28636fa39f4adb810
Post / EVSE Identifier #7COD20240000036360PR00011495
Post / EVSE Identifier #8ES*ARE*EU4FXM65LSLAQD7O5

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

Sabado (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN

Accessibility & Amenities

Standard public access. Additional amenities: CAFETERÍA, RESTAURANTE, CENTRO COMERCIAL, APARCAMIENTO, SUPERMERCADO, NATURALEZA

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.948717 | Lon: -4.5136973View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
4.6 km away

E-P-Palencia-004

Madrid,24
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
8 points • 8 plugs
Details
50 kW(Fast)
5.4 km away

P-VentadeBaños-001

Autovia De Castilla A-62 (N-620),90
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.