100 kW• Fast24/7Active in MITECO registry

ACCIONA - Restaurante A Campiña

Carretera Vegadeo-Pontevedra, Lugo (27192), Lugo, Spain
Network OperatorACCIONA Recarga
Total Capacity2 bays (2 plugs)
GPS Coordinates43.03296, -7.53248
Official ID2024006472
Official Registry DateOct 24, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Lugo, belonging to the province of Lugo (Galicia, Spain). The charging equipment and commercial operation belong to the ACCIONA Recarga network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006472
Post / EVSE Identifier #1COD20240000044549PR00016564
Post / EVSE Identifier #2ES*ARE*E3IIXS9ZG0PVONCP2IR0V
Post / EVSE Identifier #35b9247e28636fa39f4adb810
Post / EVSE Identifier #4COD20240000044550PR00016565
Post / EVSE Identifier #5ES*ARE*EZL64LC8KBCZ01X0O2OBR

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Miercoles (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN

Accessibility & Amenities

Standard public access. Additional amenities: CAFETERÍA, HOTEL, RESTAURANTE, CENTRO COMERCIAL

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.0329559 | Lon: -7.5324816View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
1.7 km away

Decathlon Lugo

Parque Empresarial As Gándaras Via A, Parcel
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
120 kW(Fast)
2.6 km away

ACCIONA - A Palloza

Lugar Muxa De Arriba, 21
Operator:ACCIONA Recarga
CCS Combo 2CHAdeMO
4 points • 4 plugs
Details
22 kW(Semi-fast)
2.9 km away

E-LU-Lugo-006

Infanta Elena,N/A
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
8 points • 8 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.