22 kW• Semi-fast24/7Active in MITECO registry

ACCIONA - El Molino

N-I, 306, Cascajares de Bureba (09280), Burgos, Spain
Network OperatorACCIONA Recarga
Total Capacity2 bays (2 plugs)
GPS Coordinates42.65164, -3.08426
Official ID2024004418
Official Registry DateJun 21, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cascajares de Bureba, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the ACCIONA Recarga network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:380 V
Amperage:16 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:380 V
Amperage:16 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004418
Post / EVSE Identifier #1COD20240000036444PR00011579
Post / EVSE Identifier #2ES*ARE*E72QO8O06TDCX5HH9
Post / EVSE Identifier #35b9247e28636fa39f4adb80d
Post / EVSE Identifier #4COD20240000036445PR00011580
Post / EVSE Identifier #5ES*ARE*EAABPAN06G9WRKHUA

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.6516379 | Lon: -3.0842608View on OpenStreetMap →

Other Nearby Charging Stations

44 kW(Fast)
1.2 km away

22XP22T3QQ1AN00814-

A-1, Pk: 235, 09001 Burgos, Spain
Operator:CEPSA COMERCIAL PETRÓLEO,S.A.U.
CCS Combo 2
1 point • 2 plugs
Details
44 kW(Fast)
1.2 km away

22XP22T3QQ1AN00844-

A-1, Pk: 235, 09001 Burgos, Spain
Operator:CEPSA COMERCIAL PETRÓLEO,S.A.U.
CCS Combo 2
1 point • 2 plugs
Details
44 kW(Fast)
1.3 km away

22XP22T3QQ1AN00839-

A-1, Pk: 235, 09001 Burgos, Spain
Operator:CEPSA COMERCIAL PETRÓLEO,S.A.U.
CCS Combo 2
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.