50 kW• Fast24/7Active in MITECO registry

A-Javea-001

Adsubia,25, Xàbia/Jávea (03739), Alicante/Alacant, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates38.76559, 0.18106
Official ID2024002110
Official Registry DateFeb 09, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Xàbia/Jávea, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024002110
Post / EVSE Identifier #1COD20240000025674PR00005325
Post / EVSE Identifier #2ES*IBD*E5286
Post / EVSE Identifier #35474
Post / EVSE Identifier #4COD20240000025675PR00005326
Post / EVSE Identifier #5ES*IBD*E5287
Post / EVSE Identifier #65476
Post / EVSE Identifier #75475

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

📅Advance slot reservation supported
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.765591 | Lon: 0.181058View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
6.5 km away

CC Alaire

Urbanizacion Poble, 3P, 03726 Alcasar, Alican
Operator:Punto Recargas SL
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
4 points • 4 plugs
Details
30 kW(Semi-fast)
9.6 km away

Marina de Denia

Puerto Deportivo
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
3 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.