22 kW• Semi-fast24/7Active in MITECO registry

A-ELCHE-019

Asuncion Parreño Garcia,1, Elx/Elche (03205), Alicante/Alacant, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates38.27162, -0.71273
Official IDILKMJITOPNX81X3UW17C
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Elx/Elche, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeILKMJITOPNX81X3UW17C
Post / EVSE Identifier #1BFXIJGKUOZPQJDBWFZFJ6MJPHAQ
Post / EVSE Identifier #2ES*IBD*E263206
Post / EVSE Identifier #3276402
Post / EVSE Identifier #45SGEH3JVCI72NXD4LZEOZJCHVVF
Post / EVSE Identifier #5ES*IBD*E263207
Post / EVSE Identifier #6276403
Post / EVSE Identifier #7JELREGBPNAHNF1K1UEG9Q8MMRJ6
Post / EVSE Identifier #8ES*IBD*E263208
Post / EVSE Identifier #9276404
Post / EVSE Identifier #105XLFIXGMCWXZZIKS0HIHRLXIK7X
Post / EVSE Identifier #11ES*IBD*E263209
Post / EVSE Identifier #12276405
Post / EVSE Identifier #13BTVFK8YVZGZPPJKUD6IE5ZJZ2GI
Post / EVSE Identifier #14ES*IBD*E263210
Post / EVSE Identifier #15276406
Post / EVSE Identifier #16ZR3QMFHRQSKWJAS3XEIXYQL2DEK
Post / EVSE Identifier #17ES*IBD*E263211
Post / EVSE Identifier #18276407

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.271623 | Lon: -0.712734View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
1.0 km away

US_013_Elche_I

Avda. Almansa 19
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
1.1 km away

E-A-Elche/Elx-019

Antonio Machado,84
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.